Things are moving right along! Our plumbing is almost finished. We have all of our sinks installed and one of our toilets. Our water heater is in as well as something that is necessary to install our outdoor sprinkling system. Our flooring is in in our bathrooms, kitchen, and foyer, and one of the bedrooms is padded and ready for carpeting. Our sidewalk is also in, and the bottom part of a column on our porch has been bricked. ![]()
![]()
01/08/2007 at 4:02 pm Permalink
The bathroom flooring is beautiful:)
01/08/2007 at 4:48 pm Permalink
wow!! looks great!!